The project for the Village of Byesville, OH, focused on a comprehensive overhaul and improvement of crucial water treatment infrastructure. This initiative encompassed several key components, including the installation of new Vertical Turbine Well Pumps and the replacement of existing 19 ft. diameter Steel Gravity Aerators/Filters. Additionally, the project involved the replacement of High Service Pumps, the installation of a new Pressure Filter Backwash Supply Pump, and the demolition of Primary and Secondary Microfiltration Skids to make way for new UF (Ultrafiltration) Skids. Modifications to piping for UF Feed Pumps, the implementation of a new Bulk Caustic Soda Storage and Feed System, associated electrical and controls work, and the installation of new Pre-Packaged Inline TTHM (Trihalomethanes) Aeration Systems were integral to the overall improvement and optimization of water treatment facilities within the Village of Byesville.
OwnerVillage of ByesvilleLocationByesville, OH